Sign in
Already have SolaX Cloud Installer Account
Or
Access to E-Learning
Contact Us
Contact Us
Our online learning platform is currently only open to Installer accounts in SolaX Cloud. If you wish to use the online platform,please send your account application to training.global@solaxpower.com

A1 HYBRID G2

Compatible with existing PV systems and allows up to four systems to be connected in parallel, with a total capacity of 30.4kW and 80kWh of storage across up to four stackable battery modules. The system supports up to 160A of Battery Inverter (BI) current and provides additional flexibility for system expansion.

  • Datasheet
  • Manual
  • QIG

FAQ

  • Dose the Hybrid inverter support the Lead-acid battery?

    Yes, Hybrid G4 series support Lead-acid battery, you can choose the battery type in the ‘Charger-Battery Type-Lead Acid’.

  • Can Hybrid inverter provide whole house loads back-up function?

    The EPS box can provide whole house loads back-up for hybrid inverter.

    For X1/X3-Hybrid G4, the SolaX Matebox Advance can also achieve this function.

  • Can Hybrid inverter control on-grid inverter?

    Only X1-Hybrid G4 can control it by connecting to EPS port.

  • Is there beeping sound when inverter into EPS mode?

    Yes, you can turn it off in setting. menu- settings- eps settings- mute

  • Is it better to have a lower start voltage?

    Yes, lower voltage means earler start-up.

  • What's the difference between Hybrid and FIT?

    FIT models is to store the energy for on-grid inverter, it has no port to connet PV input.

  • Can we install Hybrid outdoor?

    Yes, Hybrid series equipped with IP65  protection level. Pls follow the instruction of installation about the enviroment requirement

  • Is it necessary to install a meter before on-grid inverter if it's connected to a Hybrid inverter?

    The second meter is used to monitor the power situation of the 3rd party on-grid inverter, is not necessary for the AC coupling system.

  • Is there any requirement for on-grid inverter when I use "Micro-grid" function on Hybrid inverter?

    It's working for any third-party on-grid inverter and there has 3 requirement for on-grid inverter:

    1. Support 'Response to an Increase in Frequency'

    2. On-grid inverter output power < Max Hybrid inverter EPS output power

    3. On-grid inverter output power < Max battery charging power

Solution

Installation video

About Cookies

We use cookies to enhance your browsing experience, serve personalized ads or content, and analyze our traffic. By clicking "Accept All", you consent to our use of cookies.
Accept Reject