Sign in
Already have SolaX Cloud Installer Account
Or
Access to E-Learning
Contact Us
Contact Us
Our online learning platform is currently only open to Installer accounts in SolaX Cloud. If you wish to use the online platform,please send your account application to training.global@solaxpower.com
Home / Support / FAQ / Details

As an installer, what shall I do for commissioning?

After system installation, there are few steps for commission, such as Wi-Fi and basic inverter configuration. After checking all connections and turning ON all switches, when PV input has exceeded the start-up voltage, the inverter will run into checking and operating status. You can start setting up the Wi-Fi dongle via SolaX Cloud APP to config the connection to monitoring platform.

Besides, on the APP or the LCD screen you can configure the basic settings easily, including language, date&time, and the safety code according to your local grid standard, and export control if zero injection is required.

About Cookies

We use cookies to enhance your browsing experience, serve personalized ads or content, and analyze our traffic. By clicking "Accept All", you consent to our use of cookies.
Accept Reject